Project Review Comments

Back to List


Project Name
4190 Hancock Expy
Description
Location
Parcels
6502002012 6502002012
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA2325
File Number
PPR2348
Project Manager
Ashlyn Mathy
Status
Active
Created
4/13/2023 9:57:31 AM

View: Project Documents



Review Comments (23)

Link Agency Comment
PCD Project Manager
5/8/2024 11:17:27 AM
Planning has comments on the LOI and SDP. 5/8/2024 11:17:27 AM
View PCD Engineering Division
5/8/2024 9:35:08 AM
-Letter of Intent comments 5/8/2024 9:35:08 AM
View PCD Engineering Division
5/8/2024 9:34:32 AM
Final Drainage Report comments 5/8/2024 9:34:32 AM
View PCD Engineering Division
5/8/2024 9:33:57 AM
Site development comments 5/8/2024 9:33:57 AM
PCD Engineering Division
5/8/2024 9:29:50 AM
Review 2 comments on the following documents will be uploaded:
-Site development plan
-Final Drainage report
-Letter of Intent (see comments from planning)

reviewed by:

Daniel Torres
danieltorres@elpasoco.com
5/8/2024 9:29:50 AM
View EPC Stormwater Review
5/7/2024 12:35:55 PM
PBMP 5/7/2024 12:35:55 PM
EPC Stormwater Review
5/7/2024 12:16:22 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report........(to be uploaded with DS Engineering comments)
- PBMP

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
5/7/2024 12:16:22 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/24/2024 10:09:32 AM
Good afternoon Ashlyn,
Please see the attached pdf copy of CSU's 2nd review for PPR2348. Additional comments are requested.
Best,

Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
4/24/2024 10:09:32 AM
View PCD Project Manager
1/10/2024 3:57:46 PM
pbmp form comments 1/10/2024 3:57:46 PM
View PCD Project Manager
1/10/2024 3:55:19 PM
SDP comments 1/10/2024 3:55:19 PM
View PCD Project Manager
1/10/2024 3:55:02 PM
lighting plan comments 1/10/2024 3:55:02 PM
View PCD Project Manager
1/10/2024 3:54:37 PM
LOI comments 1/10/2024 3:54:37 PM
View PCD Project Manager
1/10/2024 3:54:21 PM
Landscape Plan comments 1/10/2024 3:54:21 PM
View PCD Project Manager
1/10/2024 3:53:56 PM
Drainage Report - Final - comments 1/10/2024 3:53:56 PM
View PCD Project Manager
1/10/2024 3:53:34 PM
Application Petition Form comments 1/10/2024 3:53:34 PM
PCD Engineering Division
1/10/2024 1:38:54 PM
Review 1 comments on the following documents will be uploaded by the project manager:
- letter of intent
-Site development Plan
-Drainage Report

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
1/10/2024 1:38:54 PM
Pikes Peak Regional Building Department
1/10/2024 1:38:18 PM
1. The new building can use the lot address of 4190 Hancock Expressway.
2. When submitting plans for permit, please be sure to show proper suite numbering/secondary addressing. Please see link here for secondary addressing guidelines https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf
3. No further comment.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
1/10/2024 1:38:18 PM
View El Paso County Conservation Dist
1/9/2024 12:28:03 PM
Brief comments attached as a .pdf. 1/9/2024 12:28:03 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/8/2024 3:30:19 PM
Please include the Utility Service Plan under C2.1 for CSU to review.
Best,

Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
1/8/2024 3:30:19 PM
Security Fire Protection District
1/8/2024 3:29:05 PM
The Security Fire Department has no objections to the PPR - Plot Plan Review as described. Noted the the fire hydran location was listed as between 200 and 300 FT. The builiding will be reviewd by SFD through PPRBD. MAS for SFD 1/8/2024 3:29:05 PM
View Widefield SD 3
1/8/2024 2:46:19 PM
1/8/2024 2:46:19 PM
View EPC Parks Department
1/8/2024 11:35:57 AM
See administrative Parks comments attached. 1/8/2024 11:35:57 AM
EPC Stormwater Review
1/8/2024 9:40:41 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the project manager):
- Drainage Report
- PBMP

Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
1/8/2024 9:40:41 AM