Project Review Comments

Back to List


Project Name
4-Way Commercial Site Development Plan
Description
Property recently rezoned to CS (CS223). Request multiple uses - boat/RV storage as well as a mixed use building comprised of some office space, a small restaurant but will primarily be utilized for mini-warehousing.
Location
Parcels
4200000399 4200000399
Applicant
Vertex Consulting Services
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
EA Number
EA22107
File Number
PPR2347
Project Manager
Ashlyn Mathy
Status
Active
Created
2/3/2023 10:47:58 AM

View: Project Documents



Review Comments (45)

Link Agency Comment
Falcon School District 49
1/17/2024 11:29:32 AM
District 49 appreciates the opportunity to comment and apologies for the delayed response.

District 49 does not have any comments at this time but respectfully reserves the right to comment on any future submittals.
1/17/2024 11:29:32 AM
View Colorado Department of Transportation - Pueblo Office
1/16/2024 4:52:32 PM
1/16/2024 4:52:32 PM
View El Paso County Conservation Dist
1/9/2024 12:25:50 PM
Apologies for delayed comments; communication error on my part. Attached as a .pdf. 1/9/2024 12:25:50 PM
View El Paso County Conservation Dist
1/9/2024 12:25:25 PM
Apologies for delayed comments; communication error on my part. Attached as a .pdf. 1/9/2024 12:25:25 PM
Upper Black Squirrel Creek GWMD
1/4/2024 12:45:37 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. 1/4/2024 12:45:37 PM
View PCD Engineering Division
12/29/2023 4:08:55 PM
(SWMP redlines) 12/29/2023 4:08:55 PM
View PCD Engineering Division
12/29/2023 4:08:10 PM
(PDB/BMP Agreement redlines) 12/29/2023 4:08:10 PM
View PCD Engineering Division
12/29/2023 4:07:40 PM
(ESQCP redlines) 12/29/2023 4:07:40 PM
View PCD Engineering Division
12/29/2023 4:07:12 PM
(FAE redlines) 12/29/2023 4:07:12 PM
View PCD Engineering Division
12/29/2023 4:06:47 PM
(GEC redlines) 12/29/2023 4:06:47 PM
View PCD Engineering Division
12/29/2023 4:06:10 PM
(FDR redlines summary) 12/29/2023 4:06:10 PM
View PCD Engineering Division
12/29/2023 4:05:47 PM
(FDR redlines) 12/29/2023 4:05:47 PM
View PCD Engineering Division
12/29/2023 4:05:15 PM
(TIS redlines) 12/29/2023 4:05:15 PM
View PCD Engineering Division
12/29/2023 4:04:20 PM
(Letter of Intent redlines) 12/29/2023 4:04:20 PM
View PCD Engineering Division
12/29/2023 4:03:35 PM
(Site Development Plan redlines) 12/29/2023 4:03:35 PM
PCD Engineering Division
12/29/2023 3:41:02 PM
Review 1 Engineering comments provided on the following documents:
- Site Development Plan
- Letter of Intent
- TIS
- Final Drainage Report (summary provided)
- GEC Plans
- FAE
- ESQCP
- PDB/BMP Agreement
- SWMP

Additional comments will be provided on complete, revised documents and pending approval of any deviations.

Coordination with CDOT and EPC Parks is necessary.


Jeff Rice
jeffrice@elpasoco.com
12/29/2023 3:41:02 PM
Colorado Parks and Wildlife
12/28/2023 1:54:37 PM
Colorado Parks and Wildlife (CPW) has reviewed the plans for the 4-Way Commercial Site Development Plan in El Paso County. Colorado Parks and Wildlife (CPW) is in receipt of the above referenced permit application and is familiar with the site. Based both on the location and type of action that has been taken CPW anticipates that the impacts to the wildlife resource from this project would be negligible.

We appreciate being given the opportunity to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
12/28/2023 1:54:37 PM
View EPC Stormwater Review
12/28/2023 9:07:05 AM
SWMP Checklist 12/28/2023 9:07:05 AM
View EPC Stormwater Review
12/28/2023 9:06:44 AM
SWMP 12/28/2023 9:06:44 AM
View EPC Stormwater Review
12/28/2023 9:06:08 AM
SDI 2 12/28/2023 9:06:08 AM
View EPC Stormwater Review
12/28/2023 9:05:54 AM
SDI 1 12/28/2023 9:05:54 AM
View EPC Stormwater Review
12/28/2023 9:05:39 AM
Private Detention Basin / Stormwater Quality BMP Maintenance Agreement 12/28/2023 9:05:39 AM
View EPC Stormwater Review
12/28/2023 9:05:22 AM
PBMP Applicability Form 12/28/2023 9:05:22 AM
View EPC Stormwater Review
12/28/2023 9:05:08 AM
GEC Checklist 12/28/2023 9:05:08 AM
View EPC Stormwater Review
12/28/2023 9:04:52 AM
GEC Plan 12/28/2023 9:04:52 AM
View EPC Stormwater Review
12/28/2023 9:04:23 AM
ESQCP 12/28/2023 9:04:23 AM
EPC Stormwater Review
12/28/2023 9:01:43 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded with Development Services comments)
- ESQCP
- FAE.......................(to be uploaded with Development Services comments)
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SDI 1
- SDI 2
- Site Development Plan......(to be uploaded with Development Services comments)
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
12/28/2023 9:01:43 AM
PCD Project Manager
12/27/2023 9:35:46 AM
Engineering and Stormwater staff will provide comments and documents for revisions at a later date. What has been provided is from planning with minimal stormwater and engineering comments, again, the full review from engineering and stormwater will be provided next week.

Thank you.

-Ashlyn Mathy
12/27/2023 9:35:46 AM
View PCD Project Manager
12/27/2023 9:33:55 AM
FAE comments 12/27/2023 9:33:55 AM
View PCD Project Manager
12/27/2023 9:33:29 AM
site development plan comments = planning only

-engineering staff will provide additional comments at a later date
12/27/2023 9:33:29 AM
View PCD Project Manager
12/27/2023 9:32:23 AM
sign plan comments 12/27/2023 9:32:23 AM
View PCD Project Manager
12/27/2023 9:32:03 AM
Letter of intent comments 12/27/2023 9:32:03 AM
View PCD Project Manager
12/27/2023 9:29:54 AM
Landscape plan comments 12/27/2023 9:29:54 AM
View PCD Project Manager
12/27/2023 9:29:32 AM
Lighting Plan comments 12/27/2023 9:29:32 AM
View Mountain View Electric Association, Inc.
12/26/2023 11:09:19 AM
See attached comments 12/26/2023 11:09:19 AM
View Mountain View Electric Association, Inc.
12/26/2023 11:08:40 AM
See attached comments 12/26/2023 11:08:40 AM
View Parks Advisory Board
12/26/2023 9:07:48 AM
See Parks comments attached. 12/26/2023 9:07:48 AM
Meadow Lake Airport Association
12/25/2023 9:12:09 AM
this appears to be a duplicate request for review & comment (?) 12/25/2023 9:12:09 AM
View Meadow Lake Airport Association
12/25/2023 9:10:51 AM
Comments attached. Thank you 12/25/2023 9:10:51 AM
Falcon Fire Protection District
12/18/2023 8:41:14 AM
This is a duplicate. 12/18/2023 8:41:14 AM
View Falcon Fire Protection District
12/18/2023 8:38:33 AM
12/18/2023 8:38:33 AM
View Falcon Fire Protection District
12/18/2023 8:23:12 AM
12/18/2023 8:23:12 AM
911 Authority - El Paso/Teller County
12/15/2023 10:13:18 AM
No action for E911 on this submittal.
Thank you.
Justin.
12/15/2023 10:13:18 AM
Pikes Peak Regional Building Department
12/13/2023 10:15:00 AM
1. Standard Development comments:
a. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door.
b. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing.

2. How tall is the perimeter fence? If it exceeds 7’, a separate address will need to be assigned along with a separate permit. Please clarify if this is the fencing on page C2.
3. The covered parking is a carport or canopy? Please include construction drawing. Carports and canopies are required to have separate addresses and permits.
4. Enumeration will not number the storage units within the storage buildings.
5. Signs will require separate addressing and separate permits.
6. The Conex unit containers on site will only be used for storage? See link here for RBD’s policy on containers. https://www.pprbd.org/File/ByAlias/ShippingContainers
7. If the trash enclosure exceeds 7’, a separate address will need to be assigned along with a separate permit.
You area welcome to email me with the responses if you would like.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
12/13/2023 10:15:00 AM
RBD Floodplain
12/12/2023 9:24:54 AM
Unstudied A zone is on the parcel. RBC 313.18.5 applies and requires a CLOMR or LOMR to establish "FEMA approved BFEs" to be shown on the plat

RBC313.18.5 Subdivision Proposals. All subdivision proposals shall be consistent with the need to minimize flood damage;
All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage;
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats
for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less;
All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two
and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”;
12/12/2023 9:24:54 AM