Project Review Comments
- Project Name
- El Paso County Sheriff Falcon Substation Site Development Plan
- Description
- Site development plan for the construction of a new Sheriff's substation near Falcon.
- Location
- Parcels
- 4231201055 4231201055
- Applicant
-
D2C ARCHITECTS
Kristopher Diaz ( kdiaz@d2carchitects.com )
(720) 297-0551 Kristopher Diaz ( kdiaz@d2carchitects.com )
(720) 297-0551 - EA Number
- EA22146
- File Number
- PPR2259
- Project Manager
- Joe Letke
- Status
- Active
- Created
- 10/19/2022 11:54:03 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
Falcon Fire Protection District
5/14/2024 7:38:28 AM |
The site plan the Fire District reviewed had the proposed hydrant at the front of the building within 100 feet of the proposed FDC. Please confirm with fire. The Fire District will need a separate simple detention pond maintenance and cost sharing agreement with the County. |
5/14/2024 7:38:28 AM | |
PCD Engineering Division
5/9/2024 5:24:13 PM |
Engineering Review Ver.4 Please see comments on the following documents The GEC_V4 still requires an engineer signature and stamp and all pages. Ensure SW comments are resolved. Please send update documents on 5/13 by email to review engineer. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
5/9/2024 5:24:13 PM | |
EPC Stormwater Review
5/9/2024 1:05:43 PM |
Review 4: All Stormwater comments have been addressed. Reviewed by: Christina Prete, P.E. Stormwater Manager ChristinaPrete@elpasoco.com |
5/9/2024 1:05:43 PM | |
View |
PCD Project Manager
10/31/2023 7:35:36 AM |
Site Development Plan | 10/31/2023 7:35:36 AM |
View |
PCD Project Manager
10/31/2023 7:34:53 AM |
GEC Checklist | 10/31/2023 7:34:53 AM |
View |
PCD Project Manager
10/31/2023 7:34:15 AM |
Drainage Report | 10/31/2023 7:34:15 AM |
View |
PCD Project Manager
10/31/2023 7:33:46 AM |
Financial Assurance Forms | 10/31/2023 7:33:46 AM |
PCD Project Manager
10/31/2023 7:33:16 AM |
No comments from PCD Planning. Please see the attached DPW Engineering and DPW Stormwater review comments. Joe Letke Planner II joeletke@elpasoco.com 719-520-7964 |
10/31/2023 7:33:16 AM | |
View |
EPC Stormwater Review
10/30/2023 4:04:22 PM |
FAE_v3 | 10/30/2023 4:04:22 PM |
EPC Stormwater Review
10/30/2023 3:53:53 PM |
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - FAE Please address unresolved comments for the following documents from Review 2: - GEC Plan Please address unresolved comments for the following documents from Review 1: - PBMP Applicability Form - SWMP - SWMP Checklist Please provide the following documents upon resubmittal: - ESQCP Application (Please use latest version of the ESQCP: https://publicworks.elpasoco.com/stormwater/) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
10/30/2023 3:53:53 PM | |
PCD Engineering Division
10/30/2023 8:35:39 AM |
Engineering Review Ver.3 Please see comments on the following documents FAE_V3- Comments were only partially resolved from previous Stormwater comments. Form must be signed and stamped. Please correct and resubmit. ESQCP Permit still missing- Please submit. GEC-Plan_V3 It appears the updated GEC plan was not updated or uploaded. A GEC plan was uploaded into the ESQCP file slot. The GEC_V3 still requires a signature and stamp. Ensure SW comments are resolved. Comments resolved on the following documents: SDP_V3 FDR_V3 PCD Planner please program for 5 day re-review once updated documents are received. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
10/30/2023 8:35:39 AM | |
View |
Falcon Fire Protection District
10/25/2023 12:30:03 PM |
10/25/2023 12:30:03 PM | |
View |
Falcon Fire Protection District
10/25/2023 12:29:25 PM |
10/25/2023 12:29:25 PM | |
View |
EPC Stormwater Review
9/22/2023 1:16:39 PM |
GEC Checklist_v2 | 9/22/2023 1:16:39 PM |
View |
EPC Stormwater Review
9/22/2023 1:16:18 PM |
GEC Plan_v2 | 9/22/2023 1:16:18 PM |
View |
EPC Stormwater Review
9/22/2023 1:15:53 PM |
FAE_v2 | 9/22/2023 1:15:53 PM |
EPC Stormwater Review
9/22/2023 1:10:19 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - FAE - GEC Plan - GEC Checklist Please address unresolved comments for the following documents from Review 1: - PBMP Applicability Form - SWMP - SWMP Checklist Please provide the following documents upon resubmittal: - ESQCP Application (Please use latest version of the ESQCP: https://publicworks.elpasoco.com/stormwater/) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
9/22/2023 1:10:19 PM | |
Pikes Peak Regional Building Department
9/19/2023 8:49:41 AM |
1. Some comments still apply, several pages in the Site Development plan show the address for the main fire station. Please be sure to update all site development plan pages to show 10262 Royal County Down Rd. 2. Please send exemption plat for our pre-plat approval. Enumerations is unable to approve plans submitted for permit until a copy of the recorded exemption plat has been sent to us and is in our records. Thank you, Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
9/19/2023 8:49:41 AM | |
View |
PCD Project Manager
9/18/2023 4:53:24 PM |
Please see comments in the attached Site Development Plan. Joe Letke Planner II El Paso County Planning and Communtiy Development 719-520-7964 joeletke@elpasoco.com |
9/18/2023 4:53:24 PM |
PCD Engineering Division
9/25/2023 5:27:43 PM |
Engineer Review Ver.2 Please see engineering comments on the following documents -SDP-V2. To be uploaded by PCD Planner Signature and stamp needed on the following documents: -FAE V2-Provide engineer stamp and signatures once Stormwater comments are addressed. -Final Drainage Report V2- Provide engineer stamp and signatures once Stormwater comments are addressed. -GEC Plan-V2. Provide engineer stamp and signatures once Stormwater comments are addressed. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
9/25/2023 5:27:43 PM | |
Mountain View Electric Association, Inc.
9/14/2023 3:45:54 PM |
Please reference the comment letter dated November 29, 2022. No additional comments at this time | 9/14/2023 3:45:54 PM | |
Colorado Department of Transportation - Pueblo Office
9/14/2023 3:21:19 PM |
After review of the provided documents, CDOT Staff currently has NO COMMENT pertaining to this submittal. CDOT requests the opportunity to review and comment on any future submissions relevant to this application | 9/14/2023 3:21:19 PM | |
Upper Black Squirrel Creek GWMD
9/6/2023 3:21:08 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 9/6/2023 3:21:08 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/6/2023 3:20:51 PM |
CSU UDS does not have any comments. Cooridinate with CSU Field Engineering for gas service (719-668-4985) MAR |
9/6/2023 3:20:51 PM | |
View |
El Paso County Conservation Dist
9/5/2023 9:26:06 PM |
Brief comments attached as a .PDF. | 9/5/2023 9:26:06 PM |
View |
EPC Health Department
1/13/2023 12:05:14 PM |
1/13/2023 12:05:14 PM | |
Colorado Department of Transportation - Pueblo Office
1/10/2023 11:44:12 AM |
The following disciplines have no comments regarding this development: Hydraulics, Materials, and Access. | 1/10/2023 11:44:12 AM | |
Upper Black Squirrel Creek GWMD
1/5/2023 11:12:54 AM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 1/5/2023 11:12:54 AM | |
Colorado Department of Transportation - Pueblo Office
12/27/2022 11:59:28 AM |
Submittals have been sent for review. CDOT comments are forthcoming. - Michelle Regalado | 12/27/2022 11:59:28 AM | |
Woodmen Hills Metro
12/22/2022 9:17:18 AM |
Woodmen Hills Metropolitan District does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 12/22/2022 9:17:18 AM | |
View |
El Paso County Conservation Dist
12/11/2022 4:12:40 PM |
Brief comments attached as a .PDF. | 12/11/2022 4:12:40 PM |
Pikes Peak Regional Building Department
12/2/2022 10:25:36 AM |
1. The address assigned to the new facility is 10262 Royal County Down Road. This address should be used when submitting plans for permitting. 2. Some pages in the site development plan show the address for this project as the address for the fire station, please update the site development plans to show the correct address not the address of the main fire station. 3. How tall is the proposed trash enclosure? If the trash enclosure is over 7’ in height a separate address and permit will be required. 4. We have not been sent a copy of the exemption plat for mylar review. Enumerations cannot approve plans until a copy of the recorded exemption plat has been sent to us and is in our records. Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
12/2/2022 10:25:36 AM | |
View |
PCD Engineering Division
12/1/2022 5:04:48 PM |
FAE comments | 12/1/2022 5:04:48 PM |
View |
PCD Engineering Division
12/1/2022 5:04:23 PM |
Site Development Plan comments | 12/1/2022 5:04:23 PM |
View |
PCD Engineering Division
12/1/2022 5:03:58 PM |
GEC plan comments | 12/1/2022 5:03:58 PM |
View |
PCD Engineering Division
12/1/2022 5:03:15 PM |
Drainage Report comments | 12/1/2022 5:03:15 PM |
PCD Engineering Division
12/1/2022 5:03:34 PM |
Review 1 comments on the following documents will be uploaded: -Drainage Report -Grading and Erosion Control Plan -Site Development Plan reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/1/2022 5:03:34 PM | |
View |
EPC Stormwater Review
12/1/2022 2:30:05 PM |
PBMP_v1 | 12/1/2022 2:30:05 PM |
View |
EPC Stormwater Review
12/1/2022 2:29:37 PM |
SWMP Checklist_v1 | 12/1/2022 2:29:37 PM |
View |
EPC Stormwater Review
12/1/2022 2:29:12 PM |
SWMP_v1 | 12/1/2022 2:29:12 PM |
View |
EPC Stormwater Review
12/1/2022 2:28:40 PM |
GEC Checklist_v1 | 12/1/2022 2:28:40 PM |
PCD Project Manager
12/1/2022 9:29:48 AM |
The document you have provided in lieu of the application is not the correct document. Please coordinate with the PCD Project Manager regarding the correct application. | 12/1/2022 9:29:48 AM | |
PCD Project Manager
12/1/2022 9:29:06 AM |
Planning Division has no comments at this time. | 12/1/2022 9:29:06 AM | |
EPC Stormwater Review
12/1/2022 2:25:23 PM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(to be uploaded by PM with PCD comments) - FAE.......................(to be uploaded by PM with PCD comments) - GEC Plan...............(to be uploaded by PM with PCD comments) - GEC Checklist - SWMP - SWMP Checklist - PBMP Applicability Form Please provide the following documents upon resubmittal: - ESQCP (Please use latest version of the ESQCP: https://publicworks.elpasoco.com/stormwater/) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
12/1/2022 2:25:23 PM | |
View |
Mountain View Electric Association, Inc.
11/29/2022 4:08:37 PM |
See attached comments | 11/29/2022 4:08:37 PM |
County Attorney - Development Review
11/29/2022 2:24:54 PM |
No comments at this time. | 11/29/2022 2:24:54 PM | |
View |
Falcon Fire Protection District
11/29/2022 10:33:42 AM |
11/29/2022 10:33:42 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/28/2022 10:29:39 AM |
Call CS Utilities' field engineering with any questions regarding gas service. 719-668-4985. Corey Masoumi, cmasoumi@csu.org |
11/28/2022 10:29:39 AM | |
911 Authority - El Paso/Teller County
11/23/2022 7:47:35 AM |
No action for E911 on this submittal. Thank you. Justin. |
11/23/2022 7:47:35 AM |