Project Review Comments

Back to List


Project Name
Black Diamond Cable - 7315 Cole View
Description
Location
Parcels
5408102035 5408102035
Applicant
T-Bone Construction
Drexel, Barrell & CO Tim McConnell ( tmcconnell@drexelbarrell.com )
(719) 260-0887
Drexel, Barrell & CO Tim McConnell ( tmcconnell@drexelbarrell.com )
(719) 260-0887
EA Number
EA2261
File Number
PPR2344
Project Manager
Joe Letke
Status
Active
Created
4/12/2022 10:28:29 AM

View: Project Documents



Review Comments (39)

Link Agency Comment
County Attorney - Development Review
5/14/2024 12:16:31 PM
Please see previous comment regarding Detention Maintenance Agreement. Exhibit A is a legal description of the entire property. If you wish to only grant an easement to the County over the portion of the property within which the pond will lie, that legal description is Exhibit B. The easement must extend so that it is adjacent to the public ROW or the access to your property. Please amend Agreement accordingly. 5/14/2024 12:16:31 PM
County Attorney - Development Review
5/2/2024 5:25:34 PM
Exhibit A to Detention Maintenance Agreement needs to be legal description of lot, i.e. "Lot 31, Claremont Business Park Filing No. 2." Remove plat from exhibit. 5/2/2024 5:25:34 PM
View County Attorney - Development Review
3/19/2024 12:29:56 PM
Requested edits to Detention Maintenance Agreement attached. 3/19/2024 12:29:56 PM
PCD Project Manager
3/6/2024 3:46:27 PM
All planning Comments have been resolved. 3/6/2024 3:46:27 PM
EPC Stormwater Review
3/5/2024 2:33:22 PM
Review 4: EPC DPW Stormwater comments have been resolved on the following documents:
- CDs
- Drainage Report
- SDI Form

All Stormwater comments have been addressed. The Detention Maintenance Agreement is currently under review by the County Attorney. Applicant shall address all remaining comments provided by the County Attorney and submit the Detention Maintenance Agreement with signature at, or before, the Pre-Construction Meeting. Failure to provide a signed Detention Maintenance Agreement will delay issuance of the Notice to Proceed.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
3/5/2024 2:33:22 PM
Pikes Peak Regional Building Department
3/5/2024 9:07:49 AM
Enumerations has the following comments:

1. Previous comments regarding the stop work order for the existing structure which was placed without required permit have not been addressed. This stop work order must be resolved before Enumerations will approved building plans for this proposed building.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
3/5/2024 9:07:49 AM
PCD Engineering Division
3/4/2024 10:56:18 AM
There are no comments relating to drainage or transportation. The project manager will upload any approved documents.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
3/4/2024 10:56:18 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/14/2024 2:56:04 PM
Good afternoon Christian,
Springs Utilities re-review of PPR2344 (Black Diamond Cable_7315 Cole Vw_DP) is complete. All comments have been addressed. Recommend for approval.
Best,
Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
2/14/2024 2:56:04 PM
View PCD Engineering Division
1/31/2024 1:23:19 PM
Drainage report redlines 1/31/2024 1:23:19 PM
View PCD Engineering Division
1/31/2024 1:21:55 PM
Construction drawing redlines 1/31/2024 1:21:55 PM
PCD Engineering Division
1/31/2024 1:18:29 PM
Review 3 comments for the following documents are attached:

-CDs
-Drainage report

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
1/31/2024 1:18:29 PM
View EPC Stormwater Review
1/30/2024 5:10:46 PM
SDI Form 1/30/2024 5:10:46 PM
EPC Stormwater Review
1/30/2024 4:50:51 PM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs...............................(to be uploaded with Development Services comments)
- Drainage Report............(to be uploaded with Development Services comments)
- SDI Form

EPC DPW Stormwater comments have been resolved on the following documents:
- GEC Plan
- SWMP Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
1/30/2024 4:50:51 PM
View PCD Project Manager
12/21/2023 3:03:45 PM
Please see comments on Drainage Report 12/21/2023 3:03:45 PM
View PCD Project Manager
12/21/2023 3:03:12 PM
Please see comments on GEC Plan 12/21/2023 3:03:12 PM
PCD Project Manager
12/21/2023 3:00:40 PM
Please see comments and resubmit the following:

-Drainage Report
-GEC Plan
-SDI
-SWMP Checklist

All comments have been resolved on Site Dev Plan.
12/21/2023 3:00:40 PM
PCD Project Manager
12/21/2023 10:26:29 AM
All Planning Comments have been resolved. 12/21/2023 10:26:29 AM
PCD Engineering Division
12/19/2023 11:57:16 AM
Comments have been resolved for the following documents:

-FAE
-Site plan

The drainage report will be reviewed further once additional details are provided for the water quality pond.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
12/19/2023 11:57:16 AM
View EPC Stormwater Review
12/18/2023 9:25:55 AM
SWMP Checklist 12/18/2023 9:25:55 AM
View EPC Stormwater Review
12/18/2023 9:25:25 AM
SDI Form 12/18/2023 9:25:25 AM
EPC Stormwater Review
12/18/2023 9:23:34 AM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report..........(to be uploaded by the project manager)
- GEC Plan....................(to be uploaded by the project manager)
- SDI Form
- SWMP Checklist (Provide signature)

EPC DPW Stormwater comments have been resolved on the following documents:
- Detention Maintenance Agreement
- ESQCP
- FAE
- GEC Checklist
- O&M Manual
- PBMP Applicability Form
- SWMP

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
12/18/2023 9:23:34 AM
View EPC Health Department
12/1/2023 2:19:07 PM
12/1/2023 2:19:07 PM
View PCD Project Manager
11/1/2023 4:59:53 PM
PBMP Comments 11/1/2023 4:59:53 PM
View PCD Project Manager
11/1/2023 4:59:33 PM
Detention Maintenance Agreement comments 11/1/2023 4:59:33 PM
View PCD Project Manager
11/1/2023 4:59:06 PM
Drainage Letter Comments 11/1/2023 4:59:06 PM
View PCD Project Manager
11/1/2023 4:56:29 PM
ESQCP Comments 11/1/2023 4:56:29 PM
View PCD Project Manager
11/1/2023 4:56:04 PM
Financial Assurance Form Comments Included 11/1/2023 4:56:04 PM
View PCD Project Manager
11/1/2023 4:55:25 PM
GEC Checklist Comments Included 11/1/2023 4:55:25 PM
View PCD Project Manager
11/1/2023 4:54:56 PM
GEC Comments 11/1/2023 4:54:56 PM
View PCD Project Manager
11/1/2023 4:53:10 PM
Upload lighting plan when its available. Be sure to include details of light fixtures. 11/1/2023 4:53:10 PM
View PCD Project Manager
11/1/2023 4:52:09 PM
SWMP Comments 11/1/2023 4:52:09 PM
View PCD Project Manager
11/1/2023 4:51:40 PM
SWMP Checklist Comments 11/1/2023 4:51:40 PM
View PCD Project Manager
11/1/2023 4:51:02 PM
Please include dimensions of sign shown on site development plan. 11/1/2023 4:51:02 PM
View PCD Project Manager
11/1/2023 4:50:37 PM
Site Plan comment summary on page 3 and 4. 11/1/2023 4:50:37 PM
Pikes Peak Regional Building Department
10/31/2023 11:08:06 AM
Enumerations has the following comments:

1. According to RBD records, the current building on this site was set up without the required building permits and has an open stop work order. Prior to issuing a building permit for the building proposed with this plan, this stop work order must be resolved.



Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
10/31/2023 11:08:06 AM
PCD Engineering Division
10/31/2023 1:37:02 PM
Review 1 comments for the following documents will be uploaded by the project manager.

-Drainage letter
-FAE
-Site plan

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
10/31/2023 1:37:02 PM
EPC Stormwater Review
10/31/2023 9:24:49 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the project manager):
- Drainage Report
- Detention Maintenance Agreement
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal:
- MS4 Post Construction Form
- O&M Manual
- SDI Form [needed for EDBs and all WQ BMPs that also provide detention/flood control]

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
10/31/2023 9:24:49 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/25/2023 11:27:10 AM
Good morning Christian,
CSU's 1st review of the Black Diamond Cable - 7315 Cole View project submitted under PPR2344 is complete. Additional comments are requested. Please see the attached marked up plan.
1. Show and label all existing utility service lines with diameter, material, and either Public and/or private.
1. Information note: Existing 2-inch plastic Gas Distribution Main CSU # Q32M143.
Best,
Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
10/25/2023 11:27:10 AM
Central Marksheffel Metro
10/17/2023 1:32:43 PM
This proposed project is located within the Central Marksheffel Metropolitan District boundaries. The District assesses platting and building permit fees for new development within the District Boundaries. The District also assesses a mill levy on property within the District Boundaries.

The fees for this year are as follows:

Building Permit Fees:
Commercial-
Industrial/Agricultural- $1.50/SQUARE FOOT
Lodging Land- $200/ROOM
Recreational/Institutional
Medical/Office/Retail - $2.00/sq Ft
Residential-
Single Family- $1,914/UNIT
Multi Family- $1,172/UNIT
Pronghorn Meadows F 2 & 3- $246.70/UNIT
10/17/2023 1:32:43 PM