Project Review Comments

Back to List


Project Name
Rock Island Trail (Sand Creek to Constitution Ave.)
Description
City of Colorado Springs paving existing railroad bed trail
Location
Parcels
5300000625 5300000625 5406100003 5406100003 5406100004 5406100004 5406200004 5406200004
Applicant
Kiowa Engineering Corporation
Todd Cartwright ( tcartwright@kiowaengineering.com ) Todd Cartwright ( tcartwright@kiowaengineering.com )
File Number
CDR193
Project Manager
Joe Letke
Status
Active
Created
9/9/2019 9:32:37 AM

View: Project Documents



Review Comments (33)

Link Agency Comment
View EPC Stormwater Review
5/9/2024 3:59:42 PM
SWMP Checklist 5/9/2024 3:59:42 PM
View EPC Stormwater Review
5/9/2024 3:56:14 PM
SWMP 5/9/2024 3:56:14 PM
View EPC Stormwater Review
5/9/2024 3:55:16 PM
PBMP 5/9/2024 3:55:16 PM
View EPC Stormwater Review
5/9/2024 3:54:48 PM
GEC Checklist 5/9/2024 3:54:48 PM
View EPC Stormwater Review
5/9/2024 3:54:14 PM
GEC Plan 5/9/2024 3:54:14 PM
View EPC Stormwater Review
5/9/2024 3:53:34 PM
FAE 5/9/2024 3:53:34 PM
View EPC Stormwater Review
5/9/2024 3:53:18 PM
ESQCP 5/9/2024 3:53:18 PM
View EPC Stormwater Review
5/9/2024 3:50:46 PM
Drainage Report 5/9/2024 3:50:46 PM
View EPC Stormwater Review
5/9/2024 1:38:15 PM
Construction Plans 5/9/2024 1:38:15 PM
PCD Engineering Division
5/9/2024 9:37:27 AM
Review 1 - EPC Engineering Comments have been provided on the following documents:

- Drainage Letter (to be uploaded by Storm Water Engineer)
- Construction Drawings (to be uploaded by Storm Water Engineer)

Reviewed by:
Hao Vo, PE
haovo@elpasoco.com
5/9/2024 9:37:27 AM
PCD Project Manager
5/8/2024 12:44:29 PM
Planning has no comments.

Joe Letke
Planner II
719-520-7964
5/8/2024 12:44:29 PM
EPC Stormwater Review
5/9/2024 3:48:00 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
5/9/2024 3:48:00 PM
View PCD Engineering Division
12/28/2022 7:22:39 AM
Documents reapproved 12/28/2022 7:22:39 AM
PCD Project Manager
3/5/2020 7:55:33 AM
Approved. 3/5/2020 7:55:33 AM
PCD Engineering Division
2/27/2020 3:31:27 PM
The engineering documents were reviewed and forwarded to the El Paso County ECM Administrator for approval/signature. This is a ped/bike trail therefore excluded from post construction permanent BMP’s per ECM I.7.1.B.9.
It was noted that the CD set submitted this time had two page(s) rotated; page one was oriented like the majority of the document before it was forwarded to the ECM Administrator.
Steve Kuehster
719-520-6813
2/27/2020 3:31:27 PM
View PCD Engineering Division
1/29/2020 2:17:39 PM
See Comment Letter
Address CD's and PBMP Applicability Form redlines, and provide a FAE on the resubmittal.
Steve Kuehster
719-520-6813
1/29/2020 2:17:39 PM
View PCD Engineering Division
1/29/2020 2:14:35 PM
PBMP Applicability Form V_2 redlines
Steve Kuehster
719-520-6813
1/29/2020 2:14:35 PM
View PCD Engineering Division
1/29/2020 2:06:59 PM
Construction Drawings CD V_2 redlines
Steve Kuehster
719-520-6813
1/29/2020 2:06:59 PM
Cherokee Metro Dist
12/20/2019 9:49:24 AM
Cherokee sanitary sewer crossings not shown on Sheets P1, P5, P6, P11. Shallow trail construction activity should not impact sanitary sewer due to depth of sewer unless heavy equipment is used. Contact Cherokee prior to starting construction. 12/20/2019 9:49:24 AM
View PCD Engineering Division
12/11/2019 1:08:28 PM
Comment Letter PCD Engineering Steve Kuehster 719-520-6813 12/11/2019 1:08:28 PM
View PCD Engineering Division
12/11/2019 1:09:41 PM
SWMP Redlines 12/11/2019 1:09:41 PM
View PCD Engineering Division
12/11/2019 1:06:02 PM
SWMP Checklist redlines 12/11/2019 1:06:02 PM
View PCD Engineering Division
12/11/2019 1:03:22 PM
PBMP Applicability Form redlines 12/11/2019 1:03:22 PM
View PCD Engineering Division
12/11/2019 1:04:20 PM
Grading and Erosion Control Checklist redlines 12/11/2019 1:04:20 PM
View PCD Engineering Division
12/11/2019 12:52:04 PM
Letter of responsibility (FAE) redlines 12/11/2019 12:52:04 PM
View PCD Engineering Division
12/11/2019 12:48:34 PM
Construction Drawings Redlines 12/11/2019 12:48:34 PM
View PCD Engineering Division
12/11/2019 12:47:34 PM
Drainage letter/memo Redlines 12/11/2019 12:47:34 PM
PCD Project Manager
12/10/2019 7:45:16 AM
Planning staff defers to PCD engineering staff for construction drawing review. Planning staff has no comments on the trail alignment or construction. 12/10/2019 7:45:16 AM
View Colorado Springs Airport Advisory Commission
12/6/2019 11:41:33 AM
The attached land use summary with comments will be presented at the Airport Advisory Commission meeting on December 18, 2019. 12/6/2019 11:41:33 AM
View EPC Parks Department
12/6/2019 10:24:24 AM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (No PAB Endorsement Necessary) 12/6/2019 10:24:24 AM
RBD Floodplain
12/5/2019 11:07:50 AM
please show floodplain line work on Sheet P1, any work in the floodway will require a no-rise certification 12/5/2019 11:07:50 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/27/2019 9:51:47 AM
Hey Kari,

CSU has no action items regarding this proposal. Approval is recommended, and let me know if you need anything further from me.

Thanks,

Ryne
11/27/2019 9:51:47 AM
View EPC Environmental Services
11/19/2019 12:18:25 PM
11/19/2019 12:18:25 PM