Project Review Comments
- Project Name
- Rock Island Trail (Sand Creek to Constitution Ave.)
- Description
- City of Colorado Springs paving existing railroad bed trail
- Location
- Parcels
- 5300000625 5300000625 5406100003 5406100003 5406100004 5406100004 5406200004 5406200004
- Applicant
-
Kiowa Engineering Corporation
Todd Cartwright ( tcartwright@kiowaengineering.com ) Todd Cartwright ( tcartwright@kiowaengineering.com ) - File Number
- CDR193
- Project Manager
- Joe Letke
- Status
- Active
- Created
- 9/9/2019 9:32:37 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC Stormwater Review
5/9/2024 3:59:42 PM |
SWMP Checklist | 5/9/2024 3:59:42 PM |
View |
EPC Stormwater Review
5/9/2024 3:56:14 PM |
SWMP | 5/9/2024 3:56:14 PM |
View |
EPC Stormwater Review
5/9/2024 3:55:16 PM |
PBMP | 5/9/2024 3:55:16 PM |
View |
EPC Stormwater Review
5/9/2024 3:54:48 PM |
GEC Checklist | 5/9/2024 3:54:48 PM |
View |
EPC Stormwater Review
5/9/2024 3:54:14 PM |
GEC Plan | 5/9/2024 3:54:14 PM |
View |
EPC Stormwater Review
5/9/2024 3:53:34 PM |
FAE | 5/9/2024 3:53:34 PM |
View |
EPC Stormwater Review
5/9/2024 3:53:18 PM |
ESQCP | 5/9/2024 3:53:18 PM |
View |
EPC Stormwater Review
5/9/2024 3:50:46 PM |
Drainage Report | 5/9/2024 3:50:46 PM |
View |
EPC Stormwater Review
5/9/2024 1:38:15 PM |
Construction Plans | 5/9/2024 1:38:15 PM |
PCD Engineering Division
5/9/2024 9:37:27 AM |
Review 1 - EPC Engineering Comments have been provided on the following documents: - Drainage Letter (to be uploaded by Storm Water Engineer) - Construction Drawings (to be uploaded by Storm Water Engineer) Reviewed by: Hao Vo, PE haovo@elpasoco.com |
5/9/2024 9:37:27 AM | |
PCD Project Manager
5/8/2024 12:44:29 PM |
Planning has no comments. Joe Letke Planner II 719-520-7964 |
5/8/2024 12:44:29 PM | |
EPC Stormwater Review
5/9/2024 3:48:00 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - ESQCP - FAE - GEC Plan - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
5/9/2024 3:48:00 PM | |
View |
PCD Engineering Division
12/28/2022 7:22:39 AM |
Documents reapproved | 12/28/2022 7:22:39 AM |
PCD Project Manager
3/5/2020 7:55:33 AM |
Approved. | 3/5/2020 7:55:33 AM | |
PCD Engineering Division
2/27/2020 3:31:27 PM |
The engineering documents were reviewed and forwarded to the El Paso County ECM Administrator for approval/signature. This is a ped/bike trail therefore excluded from post construction permanent BMP’s per ECM I.7.1.B.9. It was noted that the CD set submitted this time had two page(s) rotated; page one was oriented like the majority of the document before it was forwarded to the ECM Administrator. Steve Kuehster 719-520-6813 |
2/27/2020 3:31:27 PM | |
View |
PCD Engineering Division
1/29/2020 2:17:39 PM |
See Comment Letter Address CD's and PBMP Applicability Form redlines, and provide a FAE on the resubmittal. Steve Kuehster 719-520-6813 |
1/29/2020 2:17:39 PM |
View |
PCD Engineering Division
1/29/2020 2:14:35 PM |
PBMP Applicability Form V_2 redlines Steve Kuehster 719-520-6813 |
1/29/2020 2:14:35 PM |
View |
PCD Engineering Division
1/29/2020 2:06:59 PM |
Construction Drawings CD V_2 redlines Steve Kuehster 719-520-6813 |
1/29/2020 2:06:59 PM |
Cherokee Metro Dist
12/20/2019 9:49:24 AM |
Cherokee sanitary sewer crossings not shown on Sheets P1, P5, P6, P11. Shallow trail construction activity should not impact sanitary sewer due to depth of sewer unless heavy equipment is used. Contact Cherokee prior to starting construction. | 12/20/2019 9:49:24 AM | |
View |
PCD Engineering Division
12/11/2019 1:08:28 PM |
Comment Letter PCD Engineering Steve Kuehster 719-520-6813 | 12/11/2019 1:08:28 PM |
View |
PCD Engineering Division
12/11/2019 1:09:41 PM |
SWMP Redlines | 12/11/2019 1:09:41 PM |
View |
PCD Engineering Division
12/11/2019 1:06:02 PM |
SWMP Checklist redlines | 12/11/2019 1:06:02 PM |
View |
PCD Engineering Division
12/11/2019 1:03:22 PM |
PBMP Applicability Form redlines | 12/11/2019 1:03:22 PM |
View |
PCD Engineering Division
12/11/2019 1:04:20 PM |
Grading and Erosion Control Checklist redlines | 12/11/2019 1:04:20 PM |
View |
PCD Engineering Division
12/11/2019 12:52:04 PM |
Letter of responsibility (FAE) redlines | 12/11/2019 12:52:04 PM |
View |
PCD Engineering Division
12/11/2019 12:48:34 PM |
Construction Drawings Redlines | 12/11/2019 12:48:34 PM |
View |
PCD Engineering Division
12/11/2019 12:47:34 PM |
Drainage letter/memo Redlines | 12/11/2019 12:47:34 PM |
PCD Project Manager
12/10/2019 7:45:16 AM |
Planning staff defers to PCD engineering staff for construction drawing review. Planning staff has no comments on the trail alignment or construction. | 12/10/2019 7:45:16 AM | |
View |
Colorado Springs Airport Advisory Commission
12/6/2019 11:41:33 AM |
The attached land use summary with comments will be presented at the Airport Advisory Commission meeting on December 18, 2019. | 12/6/2019 11:41:33 AM |
View |
EPC Parks Department
12/6/2019 10:24:24 AM |
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (No PAB Endorsement Necessary) | 12/6/2019 10:24:24 AM |
RBD Floodplain
12/5/2019 11:07:50 AM |
please show floodplain line work on Sheet P1, any work in the floodway will require a no-rise certification | 12/5/2019 11:07:50 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/27/2019 9:51:47 AM |
Hey Kari, CSU has no action items regarding this proposal. Approval is recommended, and let me know if you need anything further from me. Thanks, Ryne |
11/27/2019 9:51:47 AM | |
View |
EPC Environmental Services
11/19/2019 12:18:25 PM |
11/19/2019 12:18:25 PM |